Fort Leonard Wood

This 500,000-gallon sphere at one of our nation’s finest military bases needed a boost of additional pressure to better operate within the water system. Phoenix was contracted to raise this structure by 33’-9“. Our engineers devised a critical lift plan that used two hydraulic cranes to raise the tank, a third crane to add the new stem section, and a fourth crane for moving pieces about the site. This challenging operation was safely completed, and the cranes were released from the structure the same day that Phoenix crews worked to secure the new section in place.

Client

U.S. Army Corps of Engineers

Location

Fort Leonard Wood, MO

Tank Size & Style

500,000-Gallon Sphere Raised 33’-9” with Hydraulic Cranes

logo

Phoenix provides a complete solution, including engineering, fabrication, foundation installation, field construction, and painting, all managed by our crews to ensure quality. We are one of the few companies globally with the expertise to modify, raise, or lower your existing water storage tank. With over thirty-seven years in the water tower industry, we have the necessary experience to get the job done.

Our Locations
  • HQ: 182 S Country Rd 900 E, Avon, IN 46123
  • Kentucky: 949-,953 US-41, Sebree, KY 42455
Contact Info